Evaluator:
Evaluand:
Rate each item on a 10 point scale ranging from 1 = "inadequate" to 10 = "superior".
| CRITERIA | DESCRIPTION | POINTS |
| Introduction and Background | A brief orientation to the evaluation context and an overview of the organization of the plan are provided. The evaluand, clients, and evaluators are identified. The reader can understand the nature of the evaluand and the context for the evaluation. | |
| Purposes | The purposes of the evaluation are delineated clearly, including both formative and summative aspects if they are relevant. | |
| Audiences | Relevant primary and secondary audiences for the evaluation are identified. | |
| Decisions and Questions | The decisions that may be influenced by the evaluation as well as the specific questions addressed by the evaluation are identified. The articulation between decisions and questions is sound. | |
| Methods | The methods to be used in the evaluation are thoroughly described. Methods are appropriate within the constraints of evaluation resources such as time, budget, and personnel. | |
| Sample | The participants from whom data will be collected for the evaluation are identified. Participants might include students, teachers, instructional designers, and/or managers. The participants are appropriate to the purposes of the evaluation and the sample size is adequate to questions and methods. | |
| Instrumentation | The evaluation instruments and tools to be used are described and a rationale for their use is provided. Reliability and validity are addressed. Draft instruments are provided in appendices. | |
| Limitations | Limitations to the interpretation and generalizability of the evaluation as well as potential threats to the reliability and validity of the design and instrumentation are described. | |
| Logistics and Time Line | The parties responsible for various aspects of data collection, analysis, and reporting are clarified. Additional information about how the evaluation will be conducted should be included if it is necessary to communicating a clear plan. A reasonable schedule for implementation of the report is planned, including adequate time for analysis and report preparation. | |
| Budget | An adequate budget has been allocated for the evaluation. The amount to time required to conduct the evaluation and the fees associated should be estimated. |
RATING TOTAL.............................................................
Comments: